Graphical Work Week – Resource View
This is the fourth of a series of articles on the Graphical Work Week application that was introduced as part of Maximo Scheduler 7.6.8 in the summer of 2020. This article will focus on the Resource View, the lower of the two panes on the Graphical View tab.