IBM Maximo for Oil and Gas 9.1.0 fixes the issue DT433859 where the reason of work was not populated from PM to work order when a nested job plan was added with labor
IBM Maximo for Oil and Gas 9.1.0 fixes the issue DT433859 where the reason of work was not populated from PM to work order when a nested job plan was added with labor.
IBM Maximo for Oil and Gas 9.1.0 fixes the issue DT433859 where the reason of work was not populated from PM to work order when a nested job plan was added with labor. (IBM Maximo Application Suite - IBM Maximo for Oil and Gas 9.1.0 - Fixed known issues)