Linear Asset Management

Locate work along an asset using measures and reference points.

Start here

Confirm this product is ready, then use the lesson. The readiness checks are the gate for configuration, for a first journey and for production.

  1. Are you ready to use Linear Asset Management? Licensing and AppPoints, the records that must exist, and three checklists.
  2. Basics
  3. Configuration
  4. Practical example
  5. Practice and verify
  6. Advanced concepts

Are you ready to use Linear Asset Management?

Linear manages a continuous asset by measure: a road, a pipe, a rail or a line. It is included with Manage. A map is optional and is not this product.

Before configuration

You need Manage at a tier that includes Linear, a unit of measure, and a decision about the direction and the zero point of the asset.

Before the first successful journey

One linear asset has a start measure, an end measure and a reference method. One feature or work order sits at a measure between those ends.

Before production use

Agree who owns the measure, how often the length is surveyed, and how work orders record from-measure and to-measure. Mixing Linear with Spatial is a later integration, not the first journey.

Licensing, entitlement and AppPoints

Linear is entitled and installed as part of Maximo Manage. The MAS 9.2 licensing guidance includes Linear at the Base and Limited tiers and does not list a separate Linear install quantity. A Limited user counts Linear applications inside the three modules they may choose. There is no third-party licence inside Linear itself. If you later draw the line on a map, that is Spatial, with Spatial’s 20-point install and an Esri licence.

Keep four facts separate for Linear. Entitlement is the proof of entitlement and the License Information for IBM Maximo Application Suite. The MAS 9.2 licensing guidance supplements that agreement. Available AppPoints are the pool shown on the AppPoints Usage dashboard: Suite administration, then Suite, then Administration, then AppPoints Usage. Assigned access is the security group together with the user type on the person: Limited, Base or Premium, and Authorized or Concurrent. Consumption is what that assignment draws. Authorized users and administrators reserve AppPoints continuously. Concurrent users draw AppPoints while they are signed in. Install AppPoints stay reserved for the life of that environment. A non-production install of a component draws no install AppPoints when the same component is already installed in production. Administrators and User Management users open the dashboard. Other people need the LICENSEUSAGE security group. Compliance enforcement and idle timeout sit on the dashboard Configuration tab and are suite-administrator settings.

The same guidance publishes these user conversion ratios: Limited is 5 AppPoints for one concurrent user and 2 for one authorized user; Base is 10 concurrent and 3 authorized; Premium is 15 concurrent and 5 authorized; an administrative Base user is 10 AppPoints and an administrative Premium user is 15, both as authorized users. A Base administrator who already reserves 10 AppPoints can be given Premium application access with no further AppPoints. Those ratios were read from the MAS 9.2 licensing guidance on 18 October 2026. Your agreement sets how many AppPoints you purchased. An application that opens shows that the component is deployed. Read the proof of entitlement and the dashboard as well.

Installed and enabled applications

Linear applications are part of the Manage workspace. Confirm the linear asset fields and the Linear Referencing Method application open. There is no separate catalog install to wait for. Usable means you can save a measure on an asset and find it again. Configured means the unit, the direction and the referencing method are set.

Foundation configuration

The asset needs a linear referencing method: the unit (metres, kilometres, miles), the direction of increasing measure, and the start and end measures. Features such as a valve or a joint sit at a measure on that line. A relationship to a parent line matters when the asset is a segment of a longer route. Locations and classifications help you find the line. They do not define the measure. Calendars and crews are not a Linear prerequisite unless the journey is also a schedule.

Product configuration

Create the referencing method, then create the training asset as a linear asset and set start measure, end measure and unit. Add one feature at a measure inside the span. Grant the linear applications and the asset application to the engineer’s security group. Review the default unit so a later import does not mix metres and miles.

Infrastructure and integration

Linear runs inside Manage. No extra route, queue or GIS service is required for the measure itself. A GIS centreline is a Spatial integration and brings Spatial’s network and Esri requirements.

Data and operational readiness

The first journey needs one asset whose end measure is greater than its start, in a single unit, and one work order or feature whose from-measure and to-measure fall inside that span. A measure past the end is bad data. A missing Linear application is installation or security. Check the asset measures before you look at the server.

Setup order for a linear asset

  1. 1. Manage entitlement that includes Linear No separate install AppPoints.
  2. 2. Unit, direction and referencing method Everyone who records a measure uses the same zero and the same unit.
  3. 3. The linear asset and its start and end The span is the asset.
  4. 4. One feature or work order on that span From-measure and to-measure sit inside the ends.
Readiness for Linear Asset Management
RequirementWhy neededMandatory/Conditional/OptionalWhere to configure or verifyMinimum working exampleVerification procedureConsequence if missingRemediationSource
Manage entitlement including LinearLinear is part of Manage at Limited and Base. There is no Linear line on the install table.MandatorySuite administration → Suite → Administration → AppPoints Usage. Manage → Security → Security Groups, and the suite user type.An engineer as Base, or a Limited user whose three modules include the linear applications.Open a linear asset application with that user and read the tier on AppPoints Usage.The linear fields and applications are absent from the menu.Add the applications to the group. Do not buy a Spatial install in order to create a measure.Licensing in Maximo Application Suite 9.2
A linear referencing methodMeasures are meaningless until the unit and the direction are defined.MandatoryLinear Referencing Method, then the method on the asset.Method KM, increasing in the direction of travel, unit kilometres.Create the method and select it on a new asset.Users type distances in different units on the same asset.Create one method and make it the method for the training asset before you enter measures.Modules and applications in Maximo Application Suite 9.2
Start measure, end measure and unit on the assetThe span is how Linear knows where work sits.MandatoryAssets, linear fields, in the site that owns the asset.Asset LINE-1, start 0, end 10, unit kilometres.Save the asset and query it back. End is greater than start and the unit is KM.Features have nowhere valid to sit.Set the ends and the unit before you add features or work.Modules and applications in Maximo Application Suite 9.2
One feature or work segment inside the spanThe first journey has to place something on the line, not only define the line.MandatoryFeatures or the work order’s from-measure and to-measure.A joint at 4.2 km, or a work order from 2.0 to 2.4 on LINE-1.Read the feature back and confirm the measure is between 0 and 10.The work order saves with no position, so the line and the work are unrelated.Enter from-measure and to-measure inside the span.Modules and applications in Maximo Application Suite 9.2
Site and security groupThe asset belongs to a site, and the engineer needs the asset and linear applications.MandatorySites. Security groups for Assets and the linear applications.Site BEDFORD-equivalent training site, group LINEAR-ENG.Sign in as the engineer, open LINE-1, and as a second user without the group confirm the application is hidden.The record exists and the engineer cannot open it.Grant site access and the applications.User access and entitlements in MAS 9.1 and later
Spatial overlayA centreline on a map is Spatial, with its own install and Esri licence.OptionalThe Spatial course, after this journey works without a map.Leave the map off for the first journey.Confirm the measure reads back with Map Manager unopened.A map project starts before the measure exists.Finish the referencing method first. Add Spatial only when you need the picture.Licensing in Maximo Application Suite 9.2

A. Ready to configure

  • The user’s Manage tier includes Linear and AppPoints Usage agrees.
  • A referencing method exists with one unit and one direction.
  • The training site exists and the engineer can open Assets.
  • No Spatial install is required for this course.

B. Ready for the first end-to-end journey

  • LINE-1, or your own asset, has start, end and unit saved.
  • One feature or work order stores a measure inside that span.
  • A query by the asset returns that feature.
  • A measure beyond the end is rejected or is visibly outside the span, so the rule is visible.

C. Ready for production operation

  • One team owns the referencing method and the survey that updates end measures.
  • Imports use the same unit as the method.
  • Work orders and inspection records require from-measure and to-measure on linear assets.
  • Spatial, if added later, uses the same identifier and does not invent a second measure.

Sources for this readiness check

Licence statements come from the IBM topic named on the row. Installation of a component is a separate check from entitlement.

Before you start

Linear is documented as included in Manage. The exercise is conceptual until matched to the installed linear-asset applications and configuration.

  • Linear capability and a training asset.
  • An agreed measure unit, direction and two known reference points.

IBM sources + Assetize exercise

01 · Basics — Understand the building blocks

Linear asset management represents assets whose relevant properties and work locations vary along a length. A start/end measure identifies a segment within that asset.

Consistent units, direction and reference conventions allow two people to identify the same work area.

Topics in this series

  • Linear asset model
  • Measures and references
  • Segments and work
  • Validation
  • Features and spatial context

02 · Configuration — Work through the setup

Use a training environment and match the actions to the IBM guide for your installed build.

  1. Define a fictional 10-kilometer linear asset using the supported asset procedure.
  2. Record its measure convention and reference points.
  3. Create a training work record for the segment from kilometer 2.0 to 2.5.
  4. Inspect the recorded segment and its relation to the asset's full extent.
  5. Test an out-of-range or reversed segment and document the configured validation behavior.

03 · Practical example

Fictional teaching example

A fictional pipe has a defect between kilometer 2.0 and 2.5. Describing it merely as a defect on the pipe loses the location needed by the work crew.

04 · Practice and verify

Create two nonoverlapping work segments and show how each can be located unambiguously.

Expected result

Both segments have consistent units and direction, and invalid measures are rejected or identified for correction.

Common mistakes

  • Mixing meters and kilometers.
  • Assuming a text description preserves the measure convention.

05 · Advanced concepts

Explore changing attributes along the asset, features and spatial context. Test what happens when the asset's reference convention changes.