All learning series · Industry solution · Part 1
Maximo Oil & Gas
Connect operating risk, controlled change and maintenance work.
Before you start
MAS learning path. Match the component documentation to your installed release and maintenance build before configuring it.
- Oil & Gas installed and a fictional asset/process context.
- A training change classification and agreed review roles.
IBM sources + Assetize exercise · Not lab-verified
01 · Basics — Understand the building blocks
Oil & Gas supports safety, reliability and operational processes, including management of change and action tracking. A change proposal has different review needs from routine corrective maintenance.
A change can affect documents, training, equipment and procedures. The work order is one part of implementing that change.
Topics in this series
- Operating context
- Change classification
- Assessment and review
- Implementation actions
- Closeout and audit history
02 · Configuration — Work through the setup
Use a training environment and match the actions to the IBM guide for your installed build.
- Describe a proposed change and distinguish it from like-for-like maintenance.
- Create the appropriate training management-of-change record using the installed application process.
- Record the affected assets, operating assumptions, assessments and reviewers.
- Assign implementation actions including document and training updates where applicable.
- Review the evidence for each action before following the configured closeout process.
03 · Practical example
Fictional teaching example
A fictional plant proposes changing a pump's operating duty. Mechanical work is only one action; operating limits, maintenance tasks and instructions may also need review.
04 · Practice and verify
Build a change-impact matrix and trace three different actions through ownership, implementation and verification.
Expected result
Closure accounts for every required action, not just the physical installation.
Common mistakes
- Using an equipment description change as the entire change record.
- Leaving document or training actions outside the closeout review.
05 · Advanced concepts
Extend the scenario to permits, simultaneous work and temporary changes. Identify which controls are configured and which remain procedural responsibilities.
IBM references
Product explanations link to IBM sources. Scenarios and exercises are original Assetize guidance, not claims of executed lab procedures. Reviewed 2026-10-01.