Assetize

All learning series · Industry solution · Part 1

Maximo Renewables

Investigate renewable generation losses before selecting maintenance actions.

Start here

Confirm this product is ready, then use the lesson. The readiness checks are the gate for configuration, for a first journey and for production.

  1. Are you ready to use Maximo Renewables? Licensing and AppPoints, the records that must exist, and three checklists.
  2. Basics
  3. Configuration
  4. Practical example
  5. Practice and verify
  6. Advanced concepts

Are you ready to use Maximo Renewables?

Renewables compares expected generation with what the plant produced. The 9.2 licensing guidance’s industry-solution list does not name Renewables. Confirm the catalog entry in your suite, and price the applications the modules page actually names.

Before configuration

Read the catalog and the proof of entitlement for the Renewables capability you deployed. The modules page lists Monitor and Analyze. Monitor’s published tier is Limited. Do not invent an install quantity.

Before the first successful journey

One generating asset, a time zone, a unit, and a short series of expected and actual generation.

Before production use

The expected-generation basis and the time zone have an owner. A gap in the series is missing data, not a failed turbine, until you have both.

Licensing, entitlement and AppPoints

The MAS 9.2 licensing guidance lists the industry solutions as Aviation, Civil Infrastructure, Nuclear, Oil and Gas, Transportation and Utilities. Renewables is not in that list and it has no install quantity on the install table. The modules page lists Renewables modules as Monitor and Analyze. Monitor is priced in the same guidance at the Limited tier. Until your catalog and proof of entitlement show a Renewables-specific charge, use the tier of the application you actually grant, and record that source. Do not copy Utilities’ lack of an install line into a claim that Renewables is free, and do not copy Civil’s 50-point install onto it.

Keep four facts separate for Maximo Renewables. Entitlement is the proof of entitlement and the License Information for IBM Maximo Application Suite. The MAS 9.2 licensing guidance supplements that agreement. Available AppPoints are the pool shown on the AppPoints Usage dashboard: Suite administration, then Suite, then Administration, then AppPoints Usage. Assigned access is the security group together with the user type on the person: Limited, Base or Premium, and Authorized or Concurrent. Consumption is what that assignment draws. Authorized users and administrators reserve AppPoints continuously. Concurrent users draw AppPoints while they are signed in. Install AppPoints stay reserved for the life of that environment. A non-production install of a component draws no install AppPoints when the same component is already installed in production. Administrators and User Management users open the dashboard. Other people need the LICENSEUSAGE security group. Compliance enforcement and idle timeout sit on the dashboard Configuration tab and are suite-administrator settings.

The same guidance publishes these user conversion ratios: Limited is 5 AppPoints for one concurrent user and 2 for one authorized user; Base is 10 concurrent and 3 authorized; Premium is 15 concurrent and 5 authorized; an administrative Base user is 10 AppPoints and an administrative Premium user is 15, both as authorized users. A Base administrator who already reserves 10 AppPoints can be given Premium application access with no further AppPoints. Those ratios were read from the MAS 9.2 licensing guidance on 18 October 2026. Your agreement sets how many AppPoints you purchased. An application that opens shows that the component is deployed. Read the proof of entitlement and the dashboard as well.

Installed and enabled applications

Confirm whether Renewables is a deployed application in your catalog and which Manage or Monitor version it sits on. Installed means that application opens. Configured means a site has a generation asset, a unit and a time zone. Usable means expected and actual values for the same interval appear together.

Foundation configuration

You need the site, the time zone, the generating asset and the unit of energy. Weather or availability codes explain a gap and can follow the first comparison. A meter is the actual series when the readings already live in Manage. Classifications separate turbines from inverters.

Product configuration

Register the asset, the unit and the interval. Load a small expected series and a small actual series for the same hours. Grant analysts the Analyze path and operators the asset. Review any default that treats a missing hour as zero before you publish a performance figure.

Infrastructure and integration

A forecast service, a historian or a meter head-end is an external system with its own licence, credentials and a network path. The first journey can use values you enter. Production use of a vendor forecast needs that vendor’s subscription.

Data and operational readiness

The first journey needs one asset and a few intervals where expected and actual are both present, plus one interval where actual is missing. Same unit, same time zone. A unit mismatch is configuration. A missing hour is data. A missing application is the catalog entry you still need to confirm.

Setup order for a generation comparison

  1. 1. Catalog and entitlement check Use the application tier you grant. The 9.2 industry list does not name Renewables.
  2. 2. Site, time zone, asset, unit The interval has a clock and a unit.
  3. 3. Expected and actual for the same hours Both series, same asset.
  4. 4. One deliberate gap So a missing hour is visible.
Readiness for Maximo Renewables
RequirementWhy neededMandatory/Conditional/OptionalWhere to configure or verifyMinimum working exampleVerification procedureConsequence if missingRemediationSource
The entitlement your catalog and proof of entitlement showThe 9.2 industry list and install table do not publish a Renewables quantity. Monitor, where that is the module, is Limited.MandatorySuite administration → Suite → Administration → AppPoints Usage. Catalog. Proof of entitlement.The tier written on the entitlement for the application you open, checked against the dashboard.Grant the group and record the tier the dashboard assigns. Keep the catalog name beside it.A Utilities or Civil quantity is typed in as the Renewables price.Remove that assumption. Price the application the entitlement names.Licensing in Maximo Application Suite 9.2
The Renewables or Monitor application deployedThe modules page points at Monitor and Analyze.MandatorySuite administration → Catalog, Manage workspaceThe application you will use for this portfolio opens.Record its name and version.No generation application is on the workspace.Deploy the capability your entitlement includes before the data load.Modules and applications in Maximo Application Suite 9.2
Site time zone and energy unitIntervals compared across a day depend on the clock and the unit.MandatorySites, time zone. The unit on the series.Site time zone set, unit MWh on both series.Compare one timestamp in the site zone with the source file.Expected and actual are shifted by a day or added across units.Set the zone and the unit before loading the series.Modules and applications in Maximo Application Suite 9.2
One generating assetThe series belongs to a turbine or inverter, not to the company.MandatoryAssets.Asset WT-1 in the training site.Both series name WT-1.A site total has no asset to investigate.Create the asset and key the series to it.Modules and applications in Maximo Application Suite 9.2
Expected and actual for the same intervalsThe comparison needs both numbers on the same hour.MandatoryThe generation records or the import for the installed application.Four hours with both values, same unit.Read one hour and see expected and actual together.Only one series is loaded.Load the second series for the same hours.Modules and applications in Maximo Application Suite 9.2
A visible gapA missing actual is not a zero unless you decide it is.MandatoryOne interval with expected set and actual empty.Hour 5, expected 1.2, actual empty.The gap is visible on WT-1 and is not plotted as zero.The chart shows a fault for an hour that was never collected.Keep the hour empty until a reading arrives, or mark it as missing data.Modules and applications in Maximo Application Suite 9.2

A. Ready to configure

  • You have written down the catalog name and the dashboard tier, and you have not borrowed another product’s install quantity.
  • The application opens.
  • The site time zone and the unit are chosen.
  • One asset identifier is agreed.

B. Ready for the first end-to-end journey

  • Four matching intervals load for that asset.
  • The gap interval stays visible as missing.
  • The unit and the time zone match the source.
  • You can open the asset from the interval.

C. Ready for production operation

  • The expected-generation method and the time zone have an owner.
  • Vendor forecasts and meter systems have their own licences and a tested path.
  • Missing data and true under-performance are labelled differently.
  • The entitlement is re-read if IBM’s catalog for your suite shows a Renewables charge the 9.2 guidance did not list on 18 October 2026.

Sources for this readiness check

Licence statements come from the IBM topic named on the row. Installation of a component is a separate check from entitlement.

Before you start

MAS learning path. Match the component documentation to your installed release and maintenance build before configuring it.

  • Renewables available with a training portfolio.
  • Synthetic actual/expected generation, weather context and availability information.

IBM sources + Assetize exercise

01 · Basics — Understand the building blocks

Renewables supports performance analysis across renewable energy assets. Comparing output alone is insufficient when weather, availability and operating constraints differ.

A performance loss is an observation to investigate. A maintenance action should address an identified cause rather than every low-output interval.

Topics in this series

  • Portfolio and equipment
  • Telemetry quality
  • Expected versus actual output
  • Loss investigation
  • Maintenance feedback

02 · Configuration — Work through the setup

Use a training environment and match the actions to the IBM guide for your installed build.

  1. Select a small solar or wind training population and confirm equipment identifiers.
  2. Review units, time zones and the expected-generation basis.
  3. Compare actual and expected output for a defined period.
  4. Separate equipment downtime, operating restrictions and unexplained loss in the analysis.
  5. Assign an investigation to one actionable issue and trace its maintenance handoff.

03 · Practical example

Fictional teaching example

Two fictional solar inverters produce different daily energy. One has less available sunlight in the sample; the other has a confirmed outage. Only the second comparison directly supports the outage investigation.

04 · Practice and verify

Prepare a loss analysis for three periods: normal, constrained and unavailable. Document the evidence and chosen action.

Expected result

Each reported loss has a stated comparison basis and category; missing data does not masquerade as equipment failure.

Common mistakes

  • Comparing unlike weather conditions.
  • Opening maintenance work for every production shortfall.

05 · Advanced concepts

Explore portfolio benchmarking, asset hierarchy and the feedback from completed maintenance to performance monitoring.

IBM references

Product explanations link to IBM sources. Scenarios and exercises are original Assetize teaching material. Reviewed 2026-10-01.

Maximo ecosystem overview · Manage learning paths · Practice data in Workbench