All learning series · Industry solution · Part 1
Maximo Utilities
Learn compatible unit estimating and how a design becomes executable work.
Start here
Confirm this product is ready, then use the lesson. The readiness checks are the gate for configuration, for a first journey and for production.
- Are you ready to use Maximo Utilities? Licensing and AppPoints, the records that must exist, and three checklists.
- Basics
- Configuration
- Practical example
- Practice and verify
- Advanced concepts
Are you ready to use Maximo Utilities?
Utilities prices and tracks work with compatible units: the labor, material and equipment in a repeatable design. Have the unit library and a work location before you estimate the first job.
Before configuration
Utilities is an industry solution at Premium or Limited. The 9.2 install table does not list a Utilities install quantity.
Before the first successful journey
One compatible unit with labor, material and equipment, a work location, and rates the estimator is allowed to use.
Before production use
The unit library has an owner, rates match the period you will estimate, and designers know which units are approved.
Licensing, entitlement and AppPoints
Utilities is a Maximo Manage industry solution. The MAS 9.2 licensing guidance prices it at Premium, or at Limited when the user’s three modules include the Utilities modules. There is no Base tier for a user who is given this industry solution. The install table does not list a Utilities install quantity. Do not copy Civil Infrastructure’s 50 AppPoints or a connector’s 80 onto Utilities.
Keep four facts separate for Maximo Utilities. Entitlement is the proof of entitlement and the License Information for IBM Maximo Application Suite. The MAS 9.2 licensing guidance supplements that agreement. Available AppPoints are the pool shown on the AppPoints Usage dashboard: Suite administration, then Suite, then Administration, then AppPoints Usage. Assigned access is the security group together with the user type on the person: Limited, Base or Premium, and Authorized or Concurrent. Consumption is what that assignment draws. Authorized users and administrators reserve AppPoints continuously. Concurrent users draw AppPoints while they are signed in. Install AppPoints stay reserved for the life of that environment. A non-production install of a component draws no install AppPoints when the same component is already installed in production. Administrators and User Management users open the dashboard. Other people need the LICENSEUSAGE security group. Compliance enforcement and idle timeout sit on the dashboard Configuration tab and are suite-administrator settings.
The same guidance publishes these user conversion ratios: Limited is 5 AppPoints for one concurrent user and 2 for one authorized user; Base is 10 concurrent and 3 authorized; Premium is 15 concurrent and 5 authorized; an administrative Base user is 10 AppPoints and an administrative Premium user is 15, both as authorized users. A Base administrator who already reserves 10 AppPoints can be given Premium application access with no further AppPoints. Those ratios were read from the MAS 9.2 licensing guidance on 18 October 2026. Your agreement sets how many AppPoints you purchased. An application that opens shows that the component is deployed. Read the proof of entitlement and the dashboard as well.
Installed and enabled applications
Confirm the Utilities applications and the compatible-unit applications open on this Manage workspace. Record the component version. Installed means those applications are present. Configured means at least one compatible unit has its labor, materials and equipment. Usable means an estimator can drop that unit onto a work location and see the estimate.
Foundation configuration
You need the organization, the site and the work location, which may be an address or an operating location. Items and storerooms matter when the unit issues material. Crafts and labor rates matter because the unit carries labor hours. A design tool or GIS feed is optional for the first unit. GL accounts matter when the estimate becomes a cost you will post.
Product configuration
Create the compatible unit and its components. Point it at approved items and crafts. Give the estimator a security group for the estimating applications and the designers a group that can change the library. Review default rates so a training rate is not the production rate.
Infrastructure and integration
The estimate runs in Manage. A design system, a GIS landbase or a customer-information system is an external dependency with its own licence and a network path. The first compatible-unit journey does not require that path.
Data and operational readiness
The first journey needs one unit, one location and one estimate that explodes into labor, material and equipment. A unit with no components is an empty definition. A missing item is data. A missing estimating application is the industry solution or the security group.
Setup order for a compatible unit
- 1. Utilities entitlement Premium or Limited. No install quantity in the 9.2 table.
- 2. Site, location, crafts and items The unit references them.
- 3. One compatible unit and its components Labor, material and equipment on the unit.
- 4. An estimate at a work location The unit explodes onto that location.
| Requirement | Why needed | Mandatory/Conditional/Optional | Where to configure or verify | Minimum working example | Verification procedure | Consequence if missing | Remediation | Source |
|---|---|---|---|---|---|---|---|---|
| Utilities industry-solution entitlement | Users of the industry solution are Premium or Limited. Base excludes it. | Mandatory | Suite administration → Suite → Administration → AppPoints Usage. Manage → Security → Security Groups, and the suite user type. | An estimator on Premium, or Limited with the Utilities estimating applications inside three modules. | Grant the group and confirm the dashboard tier. | The estimator is Base and cannot open the estimating applications. | Move the user to Premium or to a qualifying Limited set of modules. | Licensing in Maximo Application Suite 9.2 |
| Utilities applications on this workspace | The industry solution is a component with its own version, not a Manage setting. | Mandatory | Suite administration → Catalog, Manage workspace | The compatible-unit and estimating applications open. | Open the application and record the component version from system information. | The menu has no compatible-unit application. | Deploy the Utilities component for the Manage version you run. | Modules and applications in Maximo Application Suite 9.2 |
| A work location | The estimate is for a place, not for a floating unit. | Mandatory | Locations or the service-address fields your design uses. | Location POLE-1 on the training site. | Create the estimate against POLE-1. | The unit exists and has nowhere to be applied. | Create the location before the estimate. | Modules and applications in Maximo Application Suite 9.2 |
| One compatible unit with labor, material and equipment | The unit is the library record that makes the estimate repeatable. | Mandatory | Compatible units. | Unit VALVE-STD with hours for a fitter, one valve item and one item of equipment. | Explode the unit onto POLE-1 and read three component lines back. | The estimate is a single free-text line. | Add the three component types before the first real design. | Modules and applications in Maximo Application Suite 9.2 |
| Rates the estimator is allowed to use | Hours without a rate do not become a cost. | Conditional | Craft rates, item costs, and the rate period. | Craft FITTER at a training hourly rate, item cost on the valve. | Read the extended cost on the estimate and compare it with hours times rate. | The explosion shows quantities and a zero cost. | Enter the rate for the period you are estimating, or keep the first journey as quantities only and say so. | Modules and applications in Maximo Application Suite 9.2 |
| Security split between library editors and estimators | Everyone who estimates should not be able to change the standard unit. | Mandatory | Manage → Security → Security Groups, and the suite user type | Group UTIL-DESIGN edits units. Group UTIL-EST creates estimates. | Sign in as the estimator and confirm the unit’s components are read only. | An estimator changes the standard valve assembly for everyone. | Remove library save from the estimator group. | User access and entitlements in MAS 9.1 and later |
A. Ready to configure
- The entitlement is Premium or Limited and the dashboard agrees.
- The Utilities applications open.
- A site, a location, a craft and an item exist.
- You know the one unit the first estimate will use.
B. Ready for the first end-to-end journey
- The compatible unit has labor, material and equipment.
- An estimate at the location explodes those components.
- Quantities match the unit.
- The estimator cannot edit the library.
C. Ready for production operation
- The unit library and the rate calendar have owners.
- Approved units are the only ones offered to estimators.
- A design or GIS feed, if you use one, has its own licence and a tested path.
- GL or project codes are on the estimate before costs are posted.
Sources for this readiness check
Licence statements come from the IBM topic named on the row. Installation of a component is a separate check from entitlement.
- Licensing in Maximo Application Suite 9.2 — MAS 9.2 licensing guidance, verified 2026-10-18
- User access and entitlements in MAS 9.1 and later — MAS 9.1 and later, verified 2026-10-18
- Accessing the AppPoints Usage Dashboard — MAS 9.2, verified 2026-10-18
- Modules and applications in Maximo Application Suite 9.2 — MAS 9.2, verified 2026-10-18
Before you start
MAS learning path. Match the component documentation to your installed release and maintenance build before configuring it.
- Utilities installed with training estimating access.
- A fictional work location, approved training rates and a small compatible-unit library.
IBM sources + Assetize exercise
01 · Basics — Understand the building blocks
Utilities supports compatible unit estimating and utility work processes. A compatible unit is a reusable definition of work resources used in an estimate; it is not an individual installed asset.
IBM distinguishes a nondesign flow using job plans from a design flow using compatible unit estimation. Choose the flow based on the work being planned.
Topics in this series
- Utility business flows
- Compatible unit library
- Estimate requests and versions
- Acceptance and work handoff
- Crew, GIS and accounting integration
02 · Configuration — Work through the setup
Use a training environment and match the actions to the IBM guide for your installed build.
- Choose a repeatable design task such as installing a standard valve assembly.
- Inspect the compatible unit definition and identify its labor, material and equipment assumptions.
- Create a training estimate request/version and add the applicable stations, units and quantities using the documented Utilities flow.
- Calculate the estimate and compare one unit with a manually calculated resource total.
- Change only the quantity, recalculate, and inspect the resource/cost difference. Trace the documented acceptance and work-order handoff without altering production work.
03 · Practical example
Fictional teaching example
An illustrative unit needs two labor hours and one valve. Three units need six base labor hours and three valves before any configured adjustments. If the estimate differs, identify the adjustment or rate instead of overwriting the total.
04 · Practice and verify
Compare one-unit and three-unit estimates and record the selected version, resources, adjustments and handoff result.
Expected result
You can explain every quantity and price used by the selected estimate version, and distinguish that estimate from actual work cost.
Common mistakes
- Confusing a compatible unit with an asset record.
- Comparing totals from different estimate versions or rate bases.
05 · Advanced concepts
Explore estimate revisions, design changes, crew qualifications, financial handoff and GIS context. Preserve the accepted version when analyzing later changes.
IBM references
Product explanations link to IBM sources. Scenarios and exercises are original Assetize teaching material. Reviewed 2026-10-01.
Maximo ecosystem overview · Manage learning paths · Practice data in Workbench