Assetize

Assetize Replay

Real behaviour. Replayed. Verified.

Scenarios that run now

  • Emergency work order on a failed critical asset — Raise emergency work, meet a stock shortage, reserve an approved alternate, assign qualified labour, issue material, record the failure and close.
  • Inbound integration fails after a mapping change — An inbound MXAPIWODETAIL message fails a modelled mapping. Correct the mapping and replay the queue.
  • Automation script regression after a deployment — Run the Script Test Harness cases for a WORKORDER save script on the selected version lens, then apply the evidenced correction.
  • Work management — Simulated status lifecycle. Creates one work order and moves it to COMP on the Maximo test stub. Not a live-verified Maximo transaction.
  • Inventory shortage — Simulated balance and material cost. Reserve, a refused over-issue, transfer and issue on the Maximo test stub. Not an Inventory Usage transaction and not live-verified.
  • Preventive maintenance — Modelled PM generation. generatewo raises a work order from an active PM with its job plan tasks and moves the next due date on by one frequency. Not live-verified. Meter-based forecasting is not modelled.
  • Purchasing — Modelled receipt and PO lifecycle. An unapproved PO stands in for a requisition. Not live-verified. There is no separate PR or PO-line execution.
  • Inspection follow-up — Incomplete inspection application. A modelled failed answer creates a follow-up work order. Not live-verified. No inspection result record is stored.
  • Hazard and permit — Incomplete HSE application. A modelled hazard service request and work order, only on MAS 9.2 with HSE enabled. Not live-verified. No permit record is stored.

24 further scenarios are planned and are not executable.

These runs use the Demo Lab scenario engine and, for record editing in the playground, the Maximo test stub. A result from either one is not a result from a customer Maximo system.

Screen checks · Demo Lab · UI Playground